Modern Mining Technology Corp., which recovers gold, silver, copper and other valuable metals from electronic waste using a proprietary aqueous-based process, announced that it has laid out an 18-month plan to build its first commercial-scale operation in North Carolina, designed with an annual capacity to produce approximately 40,000 gold equivalent ounces. The plan follows the Nov. 12, 2026, closing of the Company’s approximately US$40 million initial public offering.
Modern Mining has proven it can recover and sell metal concentrate from electronic waste. Its Greenville, NC, R&D demonstration facility has done so since November 2023, settling 41 product lots between December 2023 and June 2026. Next comes commercial scale: plant build-out, binding e-waste supply contracts and operator training, followed by commissioning and ramp-up.
“We approach electronic waste with the mindset of a mining company, as an above-ground resource rather than simply a waste stream,” said Jeet Basi, President and CEO of Modern Mining. “Building our first commercial-scale plant is the step that turns that resource into a new source of supply for the U.S. market. We designed our model so that each pre-concentration plant we add can feed the same purification hub, giving us a clear path to growth.”
